Projects

TRANSPORTATION SECTOR:

Sr. Project Client Services Duration (Months) Project Start & Completion Dates Status
1 The ADB project, “Loan 2817- INO, Study for the Services for the Indonesia Transport Sector Development Strategy and Policy, Regional Road Development Project (RRDP)”. MoNational Development Planning / National Development Planning Agency (BAPPENAS), / Asian Development Bank

(Over-seas project in Indonesia)

Responsible for working with the team to explore the relationship between transport and the Indonesia’s economy and how transport in Indonesia behaves in the economy, its contribution to the national GDP, and indication of transport investment needs for the next 5-10 years.

6

Sept. 2017

to

Mar. 2018

Completed
2 The ADB project, “Contract no. 129608-S52937, TA 9153 PAK: Preparing MFF CAREC Railway Connectivity Investment Program - PPTA CS PPTA Consultant for PAK: Preparing MFF CAREC Railway Connectivity Investment Program (48416-001)”. Asian Development Bank & MoRailways, GoPak. Upgrading the Mainline-1 (ML-1) with 4 tranches: (i) tranche 1 for upgrading and dualization of rail track for Peshawar-Rawalpindi (173 km) including new signaling and telecommunications system (including power supply for these systems) and upgrading of passenger facilities in Peshawar and Rawalpindi stations. 1 Jan. 2017
to
Feb. 2017
Completed
3 The ADB project, “Contract No. 119508-S84948 TA-8556 REG: Supporting the Cities Development Initiative for Asia - Pre-Feasibilty Study Sialkot (47285-001).” Asian Development Bank & Urban Unit, GoPunajb Identify the traffic/transport and public space opportunities need to be developed and integrated into the MTIIP process with the possible inclusion for enhanced project development as part of the PFS phase of the work. 1.5

June 2015

to

Mar.-2016

Completed.
4 The ADB project, “Contract No. 119522-S84950: TA-8556 REG: Supporting the Cities Development Initiative for Asia - Pre-Feasibilty Study Sahiwal (47285-001).” Asian Development Bank & Urban Unit, GoPunajb Identify the traffic/transport and public space opportunities need to be developed and integrated into the MTIIP process with the possible inclusion for enhanced project development as part of the PFS phase of the work. 1.5 June 2015
to
Mar.2016
Completed.
5 “TA 46263-001 REG: Central Asia Regional Economic Cooperation (CAREC): Midterm Review of the Transport and Trade Facilitation Strategy and Implementation Action Plan” Asian Development Bank Coordinating and participating of Mission in Pakistan, data collection and up-dates, write-ups on the road safety and international regional cooperation. 10 Nov. 2012
to
Sept-2013
Completed
6 Responsible for the Traffic / Transportation Plan: G-5 (formerly Ocean Heights), Block-9, Scheme No. 5, Clifton; Karachi. Triple Tree Associates, Karachi On-site Parking Plan and On and Off-site Traffic Circulation Plan. Aug. 2013
to
Oct. 2013
Completed
7 Responsible for the traffic surveys, transportation planning and traffic study for the “Ocean Height” Project, Karachi. Triple Tree Associates, Karachi Traffic surveys, on-site parking plan, site lay-out plan, on-site and off-site traffic circulation plan. 1 June 2012
to
Oct. 2012
Completed
8 Preparation of the Parking and Traffic Circulation Plans (Revision / Up-date) for the “Lucky One” (formerly Tabba Development) Project, Karachi. Tabba/Lucky Group / ARCOP. Undertook revision / up-date of the Parking and Traffic Circulation Plans as per the revised architectural plans and drawings. 0.5 Jan. 2012
to
June 2012
Completed
9 Revision and up-date of the traffic forecasts and traffic capacity analysis as per new requirements for the “Ocean Tower” (formerly Sofetel Hotel) Project, Karachi. Triple Tree Associates, Karachi Responsible for the revision & up-date of the traffic & transportation planning and traffic study for the Mall. Also advise on the traffic signage and parking of the project. 0.75 April 2011
to
July 2011
Completed
10 Revision and up-date of the traffic forecasts and traffic capacity analysis as per new requirements for the “Gulberg Galleria” (formerly Marriott Hotel) Project, Lahore. The Niaz Group, Lahore Responsible for the revision & up-date of the traffic & transportation planning and traffic study for the Gulberg Galleria. 0.5 Feb. 2011
to
March 2011
Completed
11 Data Collection, Transport Model Implication Analysis and an Effect Analysis for the Lahore Case Study for the ADB funded, Sustainable Fuel Partnership (SFP) project. Other Cities Include Colombo, Kathmandu, Tbilisi, Guangdong Province in China and Beijing Shanghai High Speed Rail Link PADECO Co., Ltd.; Japan For the Asian Development Bank (ADB) funded project, responsible for the data collection and analysis of the transport sector in Lahore. 0.5 Jan. 2011
to
March 2011
Completed
12 Responsible for the traffic surveys, transportation planning and traffic study for the Lahore City Centre (LCC), Project; DHA, Lahore. Lahore City Centre – DHA Ltd./ MGB International. Traffic surveys, on-site parking plan, site lay-out plan, on-site and off-site traffic circulation plan. 1.3 Oct. 2009
to
May 2010
Completed
13 World Bank Assisted Transport Policy and the Institutional Component of the Transport Studies of the Five Big Cities of Punjab. Services of Transportation Specialist provided to Dainchi Consultants Inc., Japan. The Urban Unit: P&D Department, GoPunjab. Urban Transport Policy/Planning Assessment. Urban Transport Institutional Assessment. Urban Transport Financing Assessment. Development of a draft Punjab Urban Transport Policy (PUTP) Development of an Institutional Realignment or Reform Plan (IRP). Public consultation. 3 Feb. 2007
to
May. 2009
Completed
14 ADB assisted Sindh Road Sector Development Programme. Services provided as a Transport Planner / Traffic Engineer to Kampsax, Finnroad / ECIL, Karachi; Pakistan. (Under Sub-consultancy Agreement with the ECIL) Works & Services Deptt. GoSindh Services provided for the road safety and traffic engineering Reform Component Also did the Road Safety Audit of the numerous provincial roads. 6 July 2006
to
August 2007
Completed
15 New Islamabad International Airport (NIIA)) facility, which is the first Green Field airport in Pakistan; spread out on 3,200 acres of land.

Services provided as a Transport Planner / Traffic Engineer to Louis Berger Group, USA / ECIL, Karachi; Pakistan. (Under Sub-consultancy Agreement with the ECIL)

CAA, GoPakistan Landside transportation forecasting, analysis and planning of the state of the art NIIA facility. 2 April 2006
to
May 2007
Completed
16 Responsible for the traffic surveys, transportation planning and traffic study for the Hommie Katrack Chambers (HKC), Project, Karachi. HKC Limited / ARCOP Traffic surveys, on-site parking plan, site lay-out plan, on-site and off-site traffic circulation plan. 1.3 June 2008
to
April 2009
Completed
17 Responsible for the traffic surveys, transportation planning and traffic study for the, “The Land Mark” Project, Karachi. Y-G Investment and Developers / ARCOP Traffic surveys, on-site parking plan, site lay-out plan, on-site and off-site traffic circulation plan. 1.3 June 2008
to
June 2009
Completed
18 Responsible for the traffic surveys, transportation planning and traffic study for the Sofetel Tower - II Project, Karachi. Triple Holdings / ARCOP Traffic surveys, on-site parking plan, site lay-out plan, on-site and off-site traffic circulation plan. 1 Feb. 2008
to
June 2009
Completed
19 Responsible for the traffic surveys, transportation planning and traffic study for the Novotel Hotel Project, Lahore. EOBI / ARCOP Traffic surveys, on-site parking plan, site lay-out plan, on-site and off-site traffic circulation plan. 1 Feb. 2008
to
April. 2009
Completed
20 Responsible for the traffic surveys, transportation planning and traffic study for the Cube Centre Project, Karachi. Noor Automobiles (Pvt.) Ltd. / ARCOP. Traffic surveys, on-site parking plan, site lay-out plan, on-site and off-site traffic circulation plan. 1 Feb. 2008
to
June 2008
Completed
21 Responsible for the traffic surveys, transportation planning and traffic study for the EFU Building Project, Karachi. EFU Life Insurance Co. / Habib Fida Ali & Associates. Traffic surveys, on-site parking plan, site lay-out plan, on-site and off-site traffic circulation plan. 1 Feb. 2008
to
July 2008
Completed
22 Responsible for the traffic surveys, transportation planning and traffic study for the Pakistan Business Centre, Karachi. Askari - Sididqsons Development / Shankland Cox, UK. Traffic surveys, on-site parking plan, site lay-out plan, on-site and off-site traffic circulation plan. 1 Feb. 2008
to
Dec. 2008
Completed
23 Transportation Planning and Traffic Study for the Tabba Development Project, Karachi. Tabba/Lucky Group / ARCOP. Traffic surveys, on-site parking plan, site lay-out plan, on-site and off-site traffic circulation plan. 2 April 2007
to
Aug. 2007
Completed
24 Transportation Planning and Traffic Study for the Grand Hyatt Development Project, Islamabad. BNP Group / ARCOP. Traffic surveys, on-site parking plan, site lay-out plan, on-site and off-site traffic circulation plan. 2 March 2007
to
Aug. 2007
Completed
25 Transportation Planning and Traffic Study for the High Rise Building (near Do Talwar) at Clifton; Karachi. Shaista Estates Traffic surveys, on-site parking plan, site lay-out plan, on-site and off-site traffic circulation plan. 1 Aug. 2007
to
Sept.2007
Completed
26 Transportation Planning and Traffic Study for the Marriott Hotel Project, Lahore. Niaz Group / ARCOP. Traffic surveys, on-site parking plan, site lay-out plan, on-site and off-site traffic circulation plan. 2 Jan. 2007
to
May 2007
Completed
27 Transportation Planning and Traffic Study for the Sofetel Hotel Project, Karachi in JV with ECIL. ARCOP. Traffic surveys, on-site parking plan, site lay-out plan, on-site and off-site traffic circulation plan. 1 Dec. 2006
to
Jan.2007
Completed
28 As a Transportation Planner, advised the Karachi Port Trust to overall improve the productivity of the port and the city to make Karachi a global financial and transportation hub, through a series of projects. KPT, GoPakistan Advised on their development works, such as KPT Flyover at Korangi, Development and Rehabilitation of Roads, namely from Mai Kolachi to Submarine Chowk, including underpasses and a fly-over, M. T. Khan Road from Jinnah Bridge to PIDC Bridge with a fly-over and M. A. Jinnah Road from Keamari to Jinnah Bridge including two fly-overs. Also advised on the future expansion plans and allied development works of the port, namely, cargo village, deep draft birth, Karachi Coastal Highway and water fountain projects. 1 May 2005
to
Jan. 2006
Completed
29

Study on Rapid Mass Transit System for Lahore. Services provided as a Senior Transport Planner to MVA, UK, Lahore; Pakistan. (Individual services provided)

Transport Deptt., GoPunjab

Worked on the project coordination, data collection and traffic data analysis and preparation of questionnaires. Did rapid appraisal of the various prospective mass transit corridors and prepared the traffic survey questionnaires along with detailed survey plans.

1 Aug. 2005
to
Sept. 2005
Completed
30 Pakistan Transport Sector Strategy. Asian Development Bank (ADB) Prepared the Pakistan Transport Sector, Strategy, covering all the modes of transport. The consultant held meetings with all the concerned stakeholders in Islamabad and the four provincial capitals. The consultant collected data from all the federal and the provincial departments and agencies, variety of organizations, NGOs, members of the civil society; and variety of donors. The diagnostic analysis was done through questionnaires and the data was collected from a wide range of sources. Also the traffic projections were made for all the transport sub-sectors. 2 Aug. 2000
to
Dec. 2001
Completed
31 Institutional Alignment Study for Metropolitan Corporation Lahore’s (MCL) Roads Functions. Metropolitan Corporation Lahore (MCL) Prepared the Resource Generation part of the Institutional Alignment Study for Metropolitan Corporation Lahore’s (MCL) Roads Functions, a component of the World Bank funded Lahore Urban Transport Project (LUTP); in Joint Venture with the NESPAK and the Lahore University of Management Sciences (LUMS). 2 Jan. 1999
to
June 2000
Completed
32 Environmental Risk Assessment for the ICI Paints Factory, Lahore. Identified vulnerable population groups, flora and fauna and infrastructure in the surrounding environment. ICI Pakistan Services of Mr. Umar Farooq, Director P&DC as Transportation Planner provided to Halcrow Fox, UK. 0.5 Jan. 98
to
April 98
Completed
33 Toll Study for the traffic forecasting and analysis, based on toll sensitivity analysis with varying tolls for the Commercial Feasibility of the nine motorways and expressways projects, with a total length of about 1,840 Km.; on the basis of BOT or Financing as a part of the national network plan for the National Highway Authority. National Highway Authority Services of Mr. Umar Farooq, Director P&DC as Advisor/Toll Expert/Economist provided to NESPAK. 2.5 June 1997
to
Nov. 97
Completed
34 Concession Proposal for an Express Bus Business for an Improved Bus Service on the 334 km. Long Lahore-Islamabad Motorway; with a special Emphasis on the Inter-urban Public Transport in Pakistan Daewoo Corporation, UK. & Seoul, Korea Services of Mr. Umar Farooq, Director P&DC as Transportation Planner provided to Halcrow Fox, UK. 2. 5 March 97
to
June 97
Completed
35 Commercial Feasibility Study of an Express Bus Service Operation for an Improved Bus Service on the 334 km. Long Lahore-Islamabad Motorway; with a special Emphasis on the Inter-urban Public Transport in Pakistan Daewoo Corporation, UK. & Seoul, Korea Services of Mr. Umar Farooq, Director P&DC as Transportation Planner provided to Halcrow Fox, UK. 2.25 Feb. 1997
to
April 1997
Completed
36 Third Farm to Market Roads Project, Punjab North. The Asian Development Bank (ADB) funded Project Govt. of the Punjab, Communication & Works Deptt. Services of Mr. Umar Farooq, Director P&DC as Transportation Planner provided to Associated Consulting Engineers 1.5 Aug. 1996
to
Jan. 1997
Completed
37 Out-line Commercial & Transportation Feasibility Study for the Islamabad Highway/Expressway Project Govt. of Pakistan, National Highway Authority Services of Mr. Umar Farooq, Director P&DC as Transportation Planner provided to Halcrow Fox, UK. 0.75 May 1996
to
May 1996
Completed
38 Identified, Planned, Developed and Designed International Standard, 180 Traffic Direction and Management Signs for the Major Arterial roads of the City of Lahore TEPA, (L.D.A) Project Manager 4 Sept. 1995
to
Dec. 1995
Completed
39 Traffic & Economic Feasibility of the Jahangira-Darband-Tahkot Highway, NWFP Govt. of Pakistan, National Highway Authority Services of Mr. Umar Farooq, Director P&DC as Transportation Planner provided to Khyber Consultants, Peshawar 1 Sept. 1995
to
Sept. 1995
Completed
40 Promotion of Private Sector Participation in Highway Financing, Construction & Operation in Pakistan. ADB Technical Assistance (T.A.) Project Govt. of Pakistan, National Highway Authority Services of Mr. Umar Farooq, Director P&DC as Transportation Planner provided to Halcrow Fox, UK. 1.25 April 1995
to
June 1995
Completed
41 Traffic and Economic Feasibility of the Sheikhupura Dera Ghazi Khan Section of the Motorway (M3) Govt. of Pakistan, National Highway Authority Services of Mr. Umar Farooq, Director P&DC as Transportation Planner provided to BCEOM, Paris France 6 Oct. 1992
to
April 1993
Completed
42 Pre-feasibility of the Lahore Light rail Project, World Bank funded Study TEPA, (L.D.A) Services of Mr. Umar Farooq, Director P&DC as Transportation Planner 2 Oct. 1993
to
Nov. 1993
Completed
43 Public Transportation Planning at the Lahore GTS Bus Stand and Railway Station Area TEPA, (L.D.A) funded by the World Bank Services of Mr. Umar Farooq, Director P&DC as Transportation Planner provided to Halcrow Fox, and Associates, UK. 4 April 1993
to
Oct. 1993
Completed

WATER SECTOR:

Sr. Project Client Services Duration (Months) Project Start & Completion Dates Status
1 Working as an Advisor: Mechanical Engineering: Third Party Monitoring of the DPR Values Project. Taunsa Barrage Emergency Rehabilitation Project.Sukkur Barrage Rehabilitation Project. I&P Department, GoPunjab Joint Venture (Individual Services provided to the National Development Consultants). 12 Nov.2007 to July. 2008 Feb. 2004 to May 2007 Jan. 2004 to May 2005 (Broken period) Completed
2 National Drainage Program – Sector Policy Studies (Package –1). Ministry of Water and Power, GoPakistan Joint Venture 6 May 2000
to
Nov. 2003
Completed
3 Study for Protection of High-pressure Pipelines of SNGPL Crossing River Sutlej U/S of Panjnad Headworks. Sui Northern Gas Pipelines, GoPakistan Planning & Development Consultants (Pvt.) Ltd. 3 Nov. 2001
to
Jan. 2002
Completed
4 Evaluation of Safety of Major Irrigation Installations / Structures in Dera Ghazi Khan Zone. Irrigation & Power Department Gov. of The Punjab Planning & Development Consultants (Pvt.) Ltd. 7 Dec. 1997
to
June 1999
Completed
5 Study for Development of Irrigation Uses in Punjab Due to Water Accord. Govt. of the Punjab, Irrigation & Power Deptt. Joint Venture 12 July 1996
to
Oct. 1997
Completed
6 Punjab Privatization of Ground Water Development. Govt. of the Punjab, Planning & Development Deptt. Services of Mr. Khalid Faruq, Director P&DC as Project Coordinator provided to Associated Consulting Engineers 3 July 1995
to
Oct. 1995
Completed
7 National Study on Reducing Government Liability Effective, Performance of Irrigation Departments and Use of Abiana for Increasing farm Outputs. Ministry of Water and Power Govt. of Pakistan; funded by the World bank Joint Venture 24 Oct. 1992
to
Oct. 1994
Completed
8 National Study for Improving Procedures for Assessment and Collection of Water Charges and Drainage Cess. Ministry of Water and Power Govt. of Pakistan; funded by the World bank Joint Venture 10 July 1989
to
April 1990
Completed
9 National Plan for Water Resources Research 1991- 2000. Pakistan Council for Research in Water Resources Prepared the Research Agenda 1 May 1991
to
July 1991
Completed
10 Proposal formulation in Pakistan Water Sector Investment Planning Study (In association with NEDCO & DELFT). Planning Commission Feasibility 1 Nov. 1988
to
Dec. 1988
Completed
11 River Hydraulic data observation and compilation of barrages in the Province of Punjab. Halcrow Provided the technical services 1 June 1995
to
August 1995
Completed
12 Restoration and Maintenance of the Major Irrigation Installations / Structures, “RD 13-BSL” including Flood Protections and Canal Embankments in Lahore Irrigation Zone. Irrigation & Power Department Gov. of the Punjab Planning & Development Consultants (Pvt.) Ltd. 5 Dec. 1998
to
April 99
Completed
13 Restoration and Maintenance of the Major Irrigation Installations / Structures, “ RD 271+152 MBL” including Flood Protections and Canal Embankments in Lahore Irrigation Zone. Irrigation & Power Department Gov. of the Punjab Planning & Development Consultants (Pvt.) Ltd. 5 Dec. 1998
to
April 1999
Completed
14 Restoration and Maintenance of the Major Irrigation Installations / Structures, “ Drainage Syphon RD 424+750 BRBD Link Canal” including Flood Protections and Canal Embankments in Lahore Irrigation Zone. Irrigation & Power Department Gov. of the Punjab Planning & Development Consultants (Pvt.) Ltd. 5 Dec. 1998
to
April 1999
Completed
15 Restoration and Maintenance of the Major Irrigation Installations / Structures, “ RD 433+958 BRBD Link Canal” adding impervious floor, Flood Protection and Canal Embankment. Irrigation & Power Department Gov. of the Punjab Planning & Development Consultants (Pvt.) Ltd. 3 Dec. 1998
to
Feb. 1999
Completed
16 Restoration and Maintenance of the Major Irrigation Installations / Structures, “Syphon RD 52+200 MLU UCC” including Flood Protections and Canal Embankments. Irrigation & Power Department Gov. of the Punjab Planning & Development Consultants (Pvt.) Ltd. 2 Dec. 1998
to
Jan. 1999
Completed
17 Restoration and Maintenance of the Major Irrigation Installations / Structures, “ RD 63+450 MLU UCC” including Flood Protections and Canal Embankments. Irrigation & Power Department Gov. of the Punjab Planning & Development Consultants (Pvt.) Ltd. 2 Dec. 1998
to
Jan. 1999
Completed

URBAN PLANNING SECTOR & OTHER PROJECTS:

Sr. Project Client Services Duration (Months) Project Start & Completion Dates Status
1 Punjab Co-operative Housing Society. The Punjab Co-operative Housing Society Survey, Planning and Detailed Engineering Designing, including BOQs & Tender Documents 7 Jan. 1992
to
Aug. 1992
Completed
2 Punjab Industrial Estate. Chohan Consultants (Pvt.) Ltd. Survey, Planning and Detailed Engineering Designing, including BOQs & Tender Documents 7 May 1994
to
Nov. 1994
Completed
3 External Electrification of Shalimar Housing Scheme. Shalimar Housing Society Survey, Planning and Detailed Engineering Designing, including BOQs & Tender Documents 6 Jan. 1994
to
June. 1994
Completed
4 Study of the procedure for the award of contracts and selection of contractors for the National Highway Board. Ministry of Communication, Govt. of Pakistan Procedural Study 2 Feb. 1988
to
March. 1988
Completed